Preparing a residential lot the week before
Crews arrive to find vehicles in the way, pets loose, nothing marked, and nobody home. None of that is the contractor’s problem to solve and all of it slows the job or causes damage. The preparation list is short, and doing it is entirely within an owner’s control.
Published by the Land Clearing Authority editorial team · Last revised 2026-07-29 · Editorial policy · Corrections
Who this is for
- Owners with clearing work booked on an occupied lot
- Anyone with pets, children, or vehicles on the property
- People whose neighbours will be affected by the work
The short answer
Move everything portable out of the working area and off the access route: vehicles, trailers, garden furniture, planters, bins, toys, hoses. Anything left will either be worked around slowly or damaged.
Mark everything you want protected: private buried lines, the septic field and lid, the wellhead, retained trees, no-traffic zones, and any boundary you are unsure of.
Handle the people and animals. Notify both neighbours with dates, arrange for pets to be elsewhere or securely indoors, and make sure someone contactable is available on the day even if not present.
And confirm the two things that have lead times: the utility locate request has been filed and the marks are valid, and the access route is clear of anything that has grown since the site walk.
What changes the answer
- How much of the property the work touches
- Whether there are pets, children, or vulnerable neighbours
- How much notice your locate request required
- Whether the work is selective and needs marking
- How long between the site walk and the work date
The list, in the order to do it
Front-loaded deliberately: the items with lead times come first, and the physical clearing of the site comes last because it is quick.
| When | Task |
|---|---|
| As early as the notice requires | Confirm the locate request is filed and marks will be valid |
| A week before | Notify both neighbours with dates and a contact |
| A week before | Arrange for pets to be elsewhere or securely indoors |
| A few days before | Mark private lines, septic, well, retained trees, no-traffic zones |
| A few days before | Walk the access route and clear anything that has grown |
| The day before | Move all vehicles, trailers, and portable items |
| The day before | Re-check every marker is still in place and visible |
| The morning | Be reachable, and unlock whatever needs unlocking |
What to move, and where to
The working area is larger than the area being cleared, because material falls and debris travels.
Ask the contractor for their debris zone and treat that as the boundary. Move vehicles beyond it rather than to the edge of it — a car parked just outside the cleared area is still inside the throw distance of a cutting head.
Then think about the access route separately. A trailer parked on a wide drive is not in the way of a car and is very much in the way of a low-loader, and the same applies to bins, planters, and anything at the gateway.
Anything you cannot move — a shed, an oil tank, a heat pump — should be pointed out explicitly and, where sensible, covered or protected.
Pets, children, and the practical reality
This is the item most often left until the morning, and it is the one with the highest consequence.
Machines are loud, unpredictable to an animal, and have limited visibility close to the ground. A dog loose on a property with a working machine is a genuine hazard to itself and a distraction to an operator. Arrange for animals to be elsewhere for the day, or securely indoors with somebody responsible for them.
The same applies to children, and to the temptation to watch from close by. Agree with the contractor where it is safe to stand and stay there. An operator who is monitoring bystanders is not fully monitoring the work.
The neighbour conversation
Do it in person if you can, a week ahead, and cover four things.
What is happening and where. Which days, and what hours. That there will be noise and possibly dust. And a number to call if something concerns them.
Then ask one question: is there anything on your side you would like me to be careful of? It costs nothing, it frequently surfaces something useful — a shed against the fence, a water butt, a plant they care about — and it converts a neighbour from a potential complainant into somebody who was consulted.
Where growth on or near the boundary is involved, that conversation should happen before the work is booked rather than the week before, because it may change the scope.
The morning itself
Three things, and then get out of the way.
Be reachable. Even if you are not present, a crew that finds something unexpected needs a decision, and an unreachable owner means either a guess or a stopped machine.
Unlock what needs unlocking — gates, outbuildings if agreed, water if the crew needs it. And do a final walk of the marking with whoever is operating, because that is the person whose understanding matters.
Then leave them to it. Watching from a distance is fine; standing near the work is not, and hovering does not improve the outcome.
What preparation does not cover
It does not make the ground workable if the weather has made it otherwise, and it does not substitute for the decisions that should have been made earlier — the objective, the scope, the marking convention, the change-order procedure.
It also does not remove the possibility of damage. Machines working close to structures on a constrained lot mark ground and occasionally catch things, and preparation reduces that rather than eliminating it.
What it does is remove the avoidable half: the items that were in the way, the pet that got out, the marker nobody replaced, and the owner nobody could reach.
What drives the cost
| Driver | Effect |
|---|---|
| Time spent moving things on the day | Crew hours spent on preparation rather than clearing |
| Unmarked features | Slower, more cautious working and stoppages to ask |
| Access route obstructions | A blocked route can delay unloading and cost part of a day |
| Owner unavailable for decisions | A stopped machine while a question waits |
| Restricted working hours agreed with neighbours | Shorter days extend the number of days on site |
Common mistakes
- Moving vehicles to the edge of the working area rather than beyond it
- Leaving the locate request until the week of the work
- Arranging pets on the morning rather than in advance
- Marking a few days early and never re-checking
- Being unreachable on the day the crew is on site
Questions to ask a contractor
- What debris zone should I clear, and how far does material travel?
- What time will you arrive, and what needs to be unlocked?
- What would you like me to mark that I might not think of?
- Where is it safe for me to stand if I want to watch?
- What decisions might you need from me during the day?
What to do next
- Confirm the locate request is filed with enough notice
- Speak to both neighbours with dates and a contact number
- Mark private lines, septic, well, retained trees, and no-traffic zones
- Move everything portable beyond the debris zone the day before
Questions people actually ask
Do I need to be home while the work happens?
Not necessarily, but you should be reachable. Crews meet unexpected things and need decisions, and an unreachable owner means either a guess or a stopped machine.
How far should I move my car?
Beyond the debris zone the contractor states, not to the edge of it. Material from a cutting head travels further than most owners expect, and a car just outside the cleared area is still exposed.
Should I cover my windows?
Where work is happening close to glazing, yes, or agree a working direction that keeps material away from it. It is a reasonable thing to ask the contractor about during the site walk.
Can my dog stay in the yard?
Not in or near the working area. Machines are loud and have poor close-range visibility, and a loose animal is a hazard to itself and a distraction to the operator. Indoors or elsewhere for the day is the safe arrangement.
Work out the scope before you ask for prices
Answer the five questions every quote depends on — what is growing, where the material goes, how deep removal has to reach, whether equipment can get in, and what the land is for afterwards. Then send one properly described project to the right kind of contractor.
Nothing on this site is a recommendation of a specific company. The guidance describes categories of work and the questions worth asking. If you decide to request quotes, the introduction is free to you, contractors may pay to receive it, and you are under no obligation to hire anyone.