Land Clearing AuthorityLand Clearing AuthorityIndependent planning resource

Services, and where each one stops

The word "clearing" covers at least four different jobs at four different prices. These pages separate them, and each one states what it does not include.

Which trade the work belongs toA decision flow. If the job is defined by specific trees with something underneath them, it is tree service. If material has to leave the site, it is full-service clearing. If work goes below the ground line, it is stump and root removal or excavation and grading. Otherwise, cutting and leaving material in place is forestry mulching.Specific trees, with something underneath?Tree serviceSoil being moved or graded to a specification?Excavation and gradingWork going below the ground line?Stump and root removalMaterial leaving the property?Full-service clearingNone of the above, and material stays on the ground →Forestry mulching

Which trade a job belongs to follows from what the work actually is, not from how large it looks. This is the ordering the contractor-type selector applies.

Core clearing services

What this category owns: removing vegetation from land, in its various scopes and by its various methods.

Land clearing

Land clearing: what the word actually covers

The umbrella term. Understand what it covers, what it usually excludes, and why two quotes for it can differ by a factor of four.

Forestry mulching

Forestry mulching: one pass, nothing hauled

One machine, one pass, residue left on the ground. Understand where it is the obvious answer and where it is the wrong tool.

Brush clearing

Brush clearing: the lightest scope, and the easiest to over-buy

Undergrowth, briars, and small stems. The lightest and cheapest end of clearing — and the easiest to over-buy.

Lot clearing

Lot clearing: small area, high specification

Clearing a defined building lot. Smaller, more constrained, and more specification-driven than acreage work.

Acreage clearing

Acreage clearing: where the economics change

Multi-acre work where mobilisation amortises, density varies across the parcel, and partial clearing usually beats total clearing.

Pasture reclamation

Pasture reclamation: the first pass is not the project

Bringing grazing ground back from encroachment. A multi-season programme, not a single clearing visit.

Trail clearing

Trail and access clearing: a corridor, not an area

Corridor work priced by length and width. Different economics from area clearing, and different mistakes.

Fence line clearing

Fence line clearing: the boundary is the hard part

Narrow corridor work along a boundary. Small in area, high in consequence — the boundary itself is the risk.

Defensible space

Defensible space: the specification is not ours to write

Reducing fuel around structures. Follow your local programme rather than a generic clearing specification.

Adjacent work

Frequently bought alongside clearing, and scoped, priced, and often performed separately. Assume it is excluded unless a quote says otherwise.

Separate trades

Different trades entirely. They are documented here so a project is not sent to a contractor who cannot do it.

Work out the scope before you ask for prices

Answer the five questions every quote depends on — what is growing, where the material goes, how deep removal has to reach, whether equipment can get in, and what the land is for afterwards. Then send one properly described project to the right kind of contractor.

Nothing on this site is a recommendation of a specific company. The guidance describes categories of work and the questions worth asking. If you decide to request quotes, the introduction is free to you, contractors may pay to receive it, and you are under no obligation to hire anyone.