Plan a land clearing project
A structured way to work out what you are buying before anyone quotes it. Nothing you enter is saved or sent, and nothing here recommends a method, a price, or a contractor.
Most clearing projects go wrong before a machine arrives, because the owner and the contractor were picturing different jobs. This works through the same ground three times: what you can observe, how much of it there is, and what you think you want done. It records what each observation does not settle, and produces a summary you can print and take into the conversation.
It produces no price, no duration, no method recommendation, and no conclusion about permits, property boundaries, wetlands, buried utilities, timber value, or whether your land can be cleared. Land Clearing Authority is an independent educational platform. It is not a contractor, surveyor, engineer, forester, environmental consultant, utility locator, or permitting authority, and it has not seen your property.
What the land has to do afterwards
Every other decision on a clearing project is downstream of this one. Nothing here is a recommendation, and none of these answers leaves your browser.
Why finishing it shortens the site visit
A contractor standing on unfamiliar ground spends the first part of a visit establishing facts the owner already knows. How dense the cover is, how thick the brush is, the diameter of the largest trunk out there, roughly how many stumps, and how steep it gets are the five answers that decide which machine goes on the trailer — and they are the same answers that move the price per acre, so a quote written without them carries a margin for those answers turning out badly. Bringing them in writing leaves the visit for the questions only somebody standing on the parcel can settle.
Naming the work you have in mind matters for the same reason, which is why the planner records it as a request rather than a specification. Two owners who both say “clear it” frequently mean total removal and selective thinning. Writing down which one you meant is the difference between quotes you can compare and quotes that were priced against different jobs. Where you have not measured something, saying so is worth more than a guess: a band invented at a keyboard reads on the printout as a fact, and gets priced like one.
What sits behind the questions
The planner is generated from two registries rather than hand-written, which is why every question carries the same discipline. 36 project conditions and 33 work methods are declared as typed entities, each one required to state what it does not establish before it can be published at all.
- Decode the words on an estimate once you have quotes in front of you
- Prepare for a site visit — what to measure, mark, and photograph first
- Compare estimates side by side on scope rather than on price
- The five decision gates every scope decision here runs through