How to compare clearing quotes properly
Three quotes for the same land are usually three quotes for different work. Normalise the scope first; comparing the prices before that is comparing nothing.
Published by the Land Clearing Authority editorial team · Last revised 2026-07-29 · Editorial policy · Corrections
Who this is for
- Anyone holding two or more quotes and unsure how to choose
- People whose quotes differ by more than they can account for
- Landowners tempted to take the lowest number
The short answer
Work in three passes. First, normalise: establish what each quote actually covers on the five gates. Second, fill the gaps: go back to each contractor with the same questions. Third, compare — but compare scope, terms, and clarity, not just price.
A quote that is cheap because it excludes the expensive half of the job is not cheap. It is a different job.
What changes the answer
- How complete each quote is to begin with
- Whether the quotes assume the same material fate
- Whether they assume the same below-grade treatment
- Whether they assume the same finished condition
- How each handles change and unknowns
- Whether they are pricing the same area
Pass one: normalise against the five gates
Before any price comparison, build a grid. Down the side, the five gates. Across the top, the quotes. Fill in what each says.
The blanks are the point. A gate a quote does not address is a gate that contractor has filled with their own assumption, and their price reflects that assumption rather than your project.
| Gate | What to extract from each quote |
|---|---|
| What is there | What area, what vegetation, what is being kept |
| Material fate | Left, chipped, piled, hauled, burned — and who pays disposal |
| Removal depth | Surface only, ground, removed, grubbed — and over which areas |
| Access | What equipment, what route, what happens if conditions change |
| End use | What the ground is specified to be on the last day |
Pass two: fill the gaps with identical questions
Go back to every contractor with the same list. Not different questions tailored to each quote — the same list.
This matters because it keeps the answers comparable, and because it is fair. A contractor who quoted completely should not be disadvantaged by being asked more questions than one who quoted vaguely.
It also surfaces something useful: how each responds. Clear, specific, prompt answers are a signal. Defensiveness about being asked to itemise is a different signal.
Pass three: compare on four axes, not one
Only now does price mean anything, and it is one of four things worth weighing.
- Scope completeness — how much of the project each quote actually covers
- Scope clarity — how much of it you could hold them to in a disagreement
- Terms — deposit, change orders, what happens when conditions differ
- Price — for the scope as normalised, not as originally quoted
What an unusually low quote usually means
Sometimes it means a contractor is local, has equipment sitting idle, and wants the work. That is real and worth having.
More often it means one of a small number of things: the scope is narrower than you think, the material handling is excluded, below-grade work is not in it, the change-order terms are loose enough to make the number provisional, or the contractor has not seen the site.
The way to tell is to normalise. If a quote is still cheapest after every gap is filled at the same scope, it is genuinely cheapest.
What an unusually high quote usually means
Often that it includes something the others do not, and reading it carefully is the fastest way to discover what the others omitted.
A high quote that itemises disposal fees, erosion control, and below-grade work has told you what the cheap quotes left out. That makes it useful even if you do not accept it.
It can also mean the contractor does not want the job and has priced accordingly, or that they have seen something on the site the others did not. Both are worth asking about directly.
Getting quotes that are comparable in the first place
The work in this guide is largely avoidable. If every contractor is given the same written description, the quotes arrive comparable.
Write the five gates down. State the area, the vegetation, the material fate you want, the below-grade treatment you want, the access constraints, and the end use. Hand the same document to everyone.
It takes an hour and saves the entire normalisation exercise.
What drives the cost
| Driver | Effect |
|---|---|
| Scope differences between quotes | The usual explanation for large gaps. Normalise before concluding anything about price. |
| Excluded disposal fees | A common source of a quote that looks cheaper than it is. |
| Below-grade work in or out | Often the single largest scope difference between two quotes. |
| Change-order terms | Loose terms make a quoted price provisional in ways a fixed scope is not. |
| Site visit or no site visit | A quote written without seeing the ground is an estimate of an assumption. |
| Mobilisation and minimums | Distance-driven and largely fixed, which affects small jobs disproportionately. |
Common mistakes
- Comparing prices before normalising scope
- Taking the lowest number without asking what it excludes
- Asking each contractor different questions
- Not asking why the high quote is high
- Requesting quotes without giving everyone the same written description
Questions to ask a contractor
- Which of the five gates does this quote address, and which does it assume?
- What would you add to this if I wanted the same finish as [the other quote]?
- Have you walked the site, and what did you see that changed your number?
- What is your change-order process if the ground is different from expected?
- What in this quote is an estimate rather than a fixed figure?
What to do next
- Build the normalisation grid from the quotes you hold
- Send every contractor the same list of gap-filling questions
- Re-rank on completeness and clarity before price
- Use the comparison tool to produce a printable side-by-side summary
Questions people actually ask
How many quotes should I get for land clearing?
Three is the usual advice and it holds up here, mainly because the third one is what tells you whether the first two are unusual. More than three has diminishing returns unless the project is large or the quotes are wildly inconsistent.
Should I always take the lowest quote?
Only after normalising. A low quote for a narrower scope is not a better deal — it is a different purchase. Once every quote covers the same work, the lowest one is genuinely the lowest.
What if the quotes are wildly different?
That is normal in this field and it almost always means the scopes differ. Check material handling and below-grade work first; they account for most large gaps. If the scopes really are identical, ask each contractor what they see that the others might not.
Do contractors mind being asked to itemise?
Good ones do not — it is a normal request and it protects them as much as you. A strong negative reaction to being asked what is included is itself useful information about how the project would go.
Work out the scope before you ask for prices
Answer the five questions every quote depends on — what is growing, where the material goes, how deep removal has to reach, whether equipment can get in, and what the land is for afterwards. Then send one properly described project to the right kind of contractor.
Nothing on this site is a recommendation of a specific company. The guidance describes categories of work and the questions worth asking. If you decide to request quotes, the introduction is free to you, contractors may pay to receive it, and you are under no obligation to hire anyone.