Land Clearing AuthorityLand Clearing AuthorityIndependent planning resource

How many quotes should I get?

Commonly three, and the value is not in finding the lowest number. It is in the differences between how three contractors describe the same parcel, which is where you learn what the job actually involves.

Who this is for

  • Anyone about to request quotes for the first time
  • Landowners with two quotes wondering whether a third is worth the time
  • People whose quotes vary so widely they cannot be compared

The short answer

Three is a reasonable default because it usually reveals the spread without consuming a fortnight. Two gives you no sense of whether either is typical; five rarely tells you more than three did.

The number matters far less than whether the quotes describe the same work. Two bids for different scopes are not competing offers, and comparing their totals is comparing nothing.

The most useful output of the exercise is not the price. It is the union of what all three contractors mentioned — because between them they will raise site issues no single one did.

If all three quotes are close and describe the same scope, you have a reliable picture. If they vary by a large multiple, the difference is nearly always in one of four decisions rather than in efficiency.

What changes the answer

  • How assessable the site is before work starts
  • Whether more than one trade is involved
  • How well you have defined what you want
  • How much local capacity exists
  • How reversible a poor outcome would be

Where large gaps actually come from

Before concluding anything about a contractor, check these four. A large spread is almost always one of them rather than a difference in efficiency or greed.

The four decisions behind most quote differences
DecisionCheap interpretationExpensive interpretation
Standing growthReduced where it standsCut, gathered, and removed
Material destinationStays on site as a layerHauled to a licensed facility
Below the ground lineRoots left in placeStumps ground or extracted
Finished surfaceLeft as it fallsShaped to a stated tolerance
AreaOnly what you asked forWorking margins and access included
RiskAssumes clean groundContingency for what cannot be seen

What a third quote adds that a second does not

With two quotes you have a range and no idea where the middle is. The third is what turns a range into information.

It also acts as a check on scope. If two contractors mention something the third did not — a drainage problem, a buried fence line, a stem larger than it looks, an access constraint — you have learned something about your property that no single visit would have revealed.

That is the genuine argument for three: you are buying three independent site assessments, and only paying for one of them. Treat the visits as free surveys and the exercise pays for itself even before the pricing.

Beyond three the returns fall off sharply, and you start consuming goodwill. Contractors talk to each other in small markets, and a landowner collecting seven bids acquires a reputation.

Making the quotes comparable

The single highest-value thing you can do is brief all three identically. Otherwise you receive answers to three different questions.

  • Write one sentence stating what the ground has to be capable of afterwards, and give it to everyone.
  • Provide the same measurements to each: access width, overhead clearance, largest stem diameter.
  • Ask each of them the same four questions about outcome, exclusions, material destination, and below-grade work.
  • Say the same thing about the material decision to each, or explicitly ask each to price both ways.
  • Do not share the other quotes’ numbers — share the scope descriptions instead, so each can explain their difference.

When fewer than three is reasonable

The default is not a rule, and there are situations where insisting on three is counterproductive.

In thin markets there may genuinely be only one or two contractors with the right equipment within a sensible travel distance. Collecting a third quote from someone unsuited to the work produces a number, not a comparison.

On small, straightforward jobs the cost of the exercise can exceed what it saves. A half-day of brush work is not worth three site visits from anyone’s perspective.

And where you have used a contractor before, on similar work, with a documented result you were happy with, that history is worth more than a competing bid from a stranger. Verification is about reducing uncertainty, and prior experience already reduced it.

Treating the visits as free surveys

The most underrated return on collecting several quotes has nothing to do with price.

Each contractor who walks your property is performing a site assessment, at their cost, from a different professional vantage point. One notices a drainage problem. One recognises the old fence line from the species growing along it. One points out that the largest stems are bigger than they look from the drive.

Between them they will surface issues no single visit would have, and none of them charges you for it. Keeping notes from each visit and pooling what was mentioned is often worth more than the price comparison.

It also improves the brief. By the third visit you can describe your own property in the terms contractors actually use, which makes every subsequent quote more accurate.

What drives the cost

Cost drivers on this kind of project
DriverEffect
Scope consistencyIdentical briefs make totals comparable. Different briefs make comparison meaningless.
Site assessabilityUnassessable sites produce wide spreads because each bidder prices different risk.
Local capacityThin markets have less price competition and longer lead times.
Trade categoryBids from different trades are not competing offers at all.
Your own preparationMeasurements and a stated end use narrow every bid you receive.

Common mistakes

  • Comparing totals before confirming the scopes match
  • Briefing each contractor differently and then comparing the answers
  • Reading the lowest number as efficiency rather than as a narrower scope
  • Sharing competitors’ prices rather than their scope descriptions
  • Collecting quotes from the wrong trade category

Questions to ask a contractor

  • Which of the four decisions does your price assume?
  • What did you notice on site that I should know about?
  • What is expressly excluded from this total?
  • If I asked for the material to stay instead, what changes?

What to do next

  1. Write the one-sentence end-use statement before contacting anyone
  2. Brief all bidders identically, with the same measurements
  3. Work the four-decision table against each quote you receive
  4. Use the quote comparison tool to line up what you hold

Questions people actually ask

Should I tell contractors I am getting other quotes?

There is no need to hide it and it is generally assumed. What is worth avoiding is sharing the other numbers, because that invites matching a price without matching the work — which is the opposite of useful.

What if one quote is far lower than the others?

Assume a scope difference before assuming a bargain. Work the four decisions: material destination and below-grade work account for most large gaps. If the scope genuinely matches, then ask what they know that the others do not.

Is the middle quote usually right?

There is no rule, and treating the middle as safe is a way of avoiding the comparison. Once the scopes match, choose on described outcome, verification, and how the contractor answered the harder questions — not on position in the range.

Does this site provide quotes?

It provides no quotes, ratings, or endorsements, and verifies no contractor’s licensing or insurance. A submitted project goes to independent contractors in the matching category, who may pay for the introduction; that relationship is disclosed in full.

Work out the scope before you ask for prices

Answer the five questions every quote depends on — what is growing, where the material goes, how deep removal has to reach, whether equipment can get in, and what the land is for afterwards. Then send one properly described project to the right kind of contractor.

Nothing on this site is a recommendation of a specific company. The guidance describes categories of work and the questions worth asking. If you decide to request quotes, the introduction is free to you, contractors may pay to receive it, and you are under no obligation to hire anyone.

This page sits in the contractor selection topic cluster. The hub states what that subject covers and, more usefully, what it deliberately excludes.

Related services

  • Land clearingThe umbrella term. Understand what it covers, what it usually excludes, and why two quotes for it can differ by a factor of four.
  • Forestry mulchingOne machine, one pass, residue left on the ground. Understand where it is the obvious answer and where it is the wrong tool.
  • Brush clearingUndergrowth, briars, and small stems. The lightest and cheapest end of clearing — and the easiest to over-buy.
  • Lot clearingClearing a defined building lot. Smaller, more constrained, and more specification-driven than acreage work.

Related cost guides

Most useful resources